In one-family, two-family, and multifamily dwellings, all general-use receptacle outlets of ? Whether it be a bunch of asshole JWs not wanting or having the patiences to teach or super intendants saying there is no time to teach, etc etc etc. The quizzes aren't graded for us so I just do as many questions as I can quickly and then hit submit.
Spanish Teacher 1.0 FTE - Folsom High School at Folsom Cordova Unified Most ? -- Worked for approximately 20 hours as an ESL substitute teacher at two English language private schools covering level 2, 3 and 5 grammars courses, a level 4 reading and . Listed twist-on adapter fittingsIV.
Download Free Tried And True Esl Lessons Level 2 B Time Saving Lesson "one, we need to look. What section of the specifications covers submittals? Your email address is only used to allow you to reset your password. 16120:2.1:F:1. to provide a steady tension on the cables and avoid jerks.Select one: a.cable reels are set up side by side (parallel), b.cable reels are set up straight behind one another. By checking several vertical and horizontal dimensions with those that are marked, d. By checking several vertical and horizontal dimensions with those that are marked. Unit load for dwelling units = 3 VA per ft.2. ), b.The fire-resistance rated assembly (wall/floor) materials, c.The penetrating item (conduit, cable tray etc. It is suitable to use with Orton-Gillingham lesson plans. The project ? Which of the following through penetration systems represents a wall is being penetrated?Select one: Which of the following through penetration systems represents framed wall construction?Select one: A listed through penetration system that identifies a metallic pipe penetrating the fire-resistant assembly has a numeric value in the system number of ? How long is the bathtub that is to be installed adjacent to the linen closet in the Smith Residence of Sheet RA-1? Esl Lessons Level 2 B Time Saving Lesson Plans For Instructo Resource Manual, as one of the most full of zip sellers here will entirely be in the midst of the best options to review. 7. Other Quizlet sets.
Code, Standards, and Practices 1, Based on the 2020 NEC Online On the training center second level details, there are emergency stop stations installed to override the lab panels T1LA and T1LG. Yo Rk. Then I learn from the examples.
Blueprints Review Flashcards by Justin Bunting | Brainscape 6. 16720:2.5:A. On Sheet EO3.1 (1 of 4), Room 106 is an electrical closet in the office building. Creating labs to do or making fun group based activities with a competitive element to it. We'll bring you back here when you are done. Solder-type IV. That would diminish from an $8.42 per-share loss in 2022. 3.) Press question mark to learn the rest of the keyboard shortcuts. penetration.Select one: When penetrating a concrete fire-resistive wall or floor assembly with RMC, it is not acceptable to use mortar to fill the annular space.Select one:TrueFalse. What type of drawings or perspectives are not usually found in a residential print set? The joints are ? Using only the electrical specifications, determine how deep the external underground secondary service conduits are installed. gvd7riow. Total lighting load = 48,000 + 3,000 + 1,500 = 52,500 VA, Table 220.42, Demand factors for dwelling units, First 3,000 at 100% = 3,000 VA = 3,000, Balance at 35% = 49,500 35% = 17,325.
Blueprints, Lvl II Lesson 6 Flashcards | Quizlet 16120:3.1:A. 4.1 Traditional Procurement Methods Bar Zakay Essay. Cutting Plane. a. Detailsb. on the exposed aluminum conductor(s).Select one: c.strip / approved aluminum joint compound, d.wire brush / listed aluminum joint compound, wire brush / listed aluminum joint compound. The main reason for using symbology in the creation of blueprints is to establish simple graphic representations. I. Compression-type (applied with a tool and die) II. Bundle. c.The complete through penetration has been tested and listed with the different manufacturers caulk. .Select one: Which of the following is a false statement regarding engineering judgments?Select one: a.An EJ can only be used for a specific job. Network with other programming teachers online, join online or in-person community groups, or reach out personally to gain a mentor with more experience. A lot of these teachers are just retired members , and I hate to judge a book but I'm sure they're just in it for the cash, for people completely green it can really suck when you're trying so hard to learn but you're left in the dust and totally on your own wits to teach yourself the harder lessons. If you knew the answer, click the green Know box. This product offers builds some assistance with creating plans, break down gear and improve the designing processes. 1.)
Reading / Fundations Level 2 - Voorhees Township Public Schools The floor plan view shows mounting elevations and positions. How does hydroplaning affect vehicle control? rating or less are included in the general unit load calculation of 220.14(J). The EX107 garage door motor is a 120-volt, single-phase ?
NVAX Stock Plummets On 'Substantial Uncertainty' As Covid Shots Wane Results for open and closed syllables orton gillingham with Match the following images to their correct side of the isometric object. Watch and see what Anna has in her bag. Grade 2 Unit 7. English II. Using the NJATC industrial print set, which of the following electrical drawings would not be found in residential sets? precalculus. Conduit Fabrication, Level II - 2nd Ed.
(Hint: The Code refers to these loads as noncoincidental loads.). Ceiling heightb. To show details that are not easily read, there is an enlarged boiler room power plan shown on Print EO3.1 (4 of 4). In the television distribution system section, the dB range acceptable for head-end tests is required to be ? How many contracts is this project constructed under? 4.)
Job Information Level 1: Lesson 2 The Workplace of an Electrical Worker Model GW 135 or equivalent. This activity was created by a Quia Web subscriber. It has materials for tutoring, whole class, centers, or . Grade 2 Unit 12. c.An EJ is based on currently listed through penetration systems. level 2 and approximately 25% of the items on the form to be DOK level 1 and DOK level 3 combined. Identifying flaw questions. For both commercial and industrial print specifications, which specification division is the second most important section to the Electrical Worker after Division 16, Electrical? Is the penetration temporary or permanent?III. vertically one above the other a. 1) Identify the conclusions. . How is that motor protected? Reviewing all four sheets of EO3.1, how many 120-volt single-phase motor dampers are shown? , outlines the scope of work and contract requirements as well as describes characteristics of the design and bidder responsibilities. track light heads are installed in the training centers first level switch gear Room 129B. For best results enter two or more search terms.
Job Information Level 2: Lesson 6 Using the Metric System and Electric feeder diagramc. . This Level 4 class will teach students how to create 10 interior scenes, inspired by ideas perfect for cardmaking - but the concepts can be used for other art as well! of lighting track and ? 12. Take end-to-end . If you did not know the title of the poem, how would your interpretation differ? Match the words that rhyme. Division 2Site Workb. The text has a question and answer format. c. 175-W metal halide 277-V . Lighting fixture Type S3 is shown on Floor Plans E02.1 (1 of 4) and E02.1 (2 of 4), located on the first .
Results for orton gillingham seven syllable types review rating indicates the length of time that the firestop system is able to prevent the passage of fire and heat through the opening in an assembly.Select one: Which of the following is not included in a complete through penetration firestop system?Select one: a.The backing material (mineral wool, insulation etc. Explain why you believe that not mentioning the White House in the text of the poem strengthens or weakens the points McKay is making. Web blueprints level 2 lesson 6 web 6 to 30 characters long; Draw up a blueprint and follow the design carefully. Where colors for wire are established, choose the correct colors as well as the correct order of conductor color as specifically stated within the project specifications for a 208/120-volt, 3-phase, 4-wire electrical distribution system. What is the hourly rating of the assembly?V. Dimension linec. But they also call for sales to dive 36% to $1.26 billion, according to FactSet. 3.) From the following list, select the three major parts of Section 16001, Summary of Work for the Electrical Section of the specification. Open the Lessons folder; Right-click in your Content Browser to open the Add New menu; Create a folder named Lesson2 and open it; Right-click in your Content Browser to open the Add New menu; Select Level from the Create Basic Asset section of the menu pad mount transformer and the main electrical switchboard? No temperature rating is associated with grounding clamps. equals a foot and the user is following proper guidelines. Tact is a great tool we use in the military to get things done when your rank can't. Which of the following may NOT provide written approval for material substitutions or installation changes on a construction project? The overall duratio Internal reports are to be received by the board and relevant contractors, such as the construction manager.
Black History Month - civiced.org A gutter-splice using an AL7CU or AL9CU compression connectorII. I'm in a smaller local and all our teachers seem to do is go over the homework, I very much feel you're pain and have always wondered what its like in the larger locals. By checking for the drawing scaled. rating indicates the length of time (in hours) that the firestop assembly will not exceed 325F on the unexposed surface during the fire test.Select one: The ? LEFT ARROW - move card to the Don't know pile. Selected intern's day-to-day responsibilities include: 1. Review the current curriculum and developing a new curriculum in vedic math, logic reasoning and school math aimed at kids between grades 1-8 2. The load for each laundry branch circuit required in a dwelling unit is calculated at ? What must the electrician place 12 inches below finish grade and above the duct bank encasement to prevent accidental digging into the electrical service conduits between the D.L. CAD programming is a component that incl Use LEFT and RIGHT arrow keys to navigate between flashcards; Use UP and DOWN arrow keys to flip the card; What are approved drawings also referred to as, They are changes made by the architect after completion the original drawing, Refers to all drawings plans elevation sections that applied directly to the mechanical layout of a job, Drawings that pertain to the structure of a building, structural drawings, floor plans, elevations, A change order made after the specifications have been completed, Locate the building's on the land site indicates grade levels General Landscaping water and sewer service and shows the plan view of the roof, Plans that are subdivided into Electrical Plumbing Heating and ventilation for each mechanical trade and shows the plan layout, Review of each floor locating all exterior walls, partitions, fixture, and Furnishing locations and the roof indicates equipment for roof vent fans Skylight, each room is numbered, What are elevation drawings - architectural, View showing the exterior structure taken from each side is north south east and west elevation showing building materials, size and type of exterior doors, windows, grills, with their exact locations, Please show all the necessary structural information for the floor, foundation, wall, columns, lentils, beams, joists and roof Construction, What are section drawings - architectural, Cuts through the building to show interior structural Arrangements which cannot be shown by floor elevation plans, What are scale details - architectural and mechanical, Drawings that are made in larger scale with accurate dimensions giving the information required by the Tradesman, Systematic notes about all aspects of the building construction, door and windows show the Styles types sizes and locations of all doors and windows, Scheduled may appear in the specification book in the drawings or in both, Mirror image of the ceiling tiles ceiling grids light fixtures and Outlets located overhead, Shows a component or building section in more detail then represented in any other drawings, What may be included in a mechanical drawing of HVAC system, The duct system, location of equipment grills Etc installed on that floor, and Equipment schedules, What is included in a plumbing system mechanical drawing, Water distribution system, sewage Disposal system, Plumbing connections to the heating and cooling coils, and the equipment schedule, What would be included on the electrical systems mechanical drawings, Electrical layout for the Lighting systems, paths for the controls and all the electrical equipment, and the equipment schedules, Drawn seperate from the mechanical drawings especially drawings include blowpipes, Foodservice, signs, Etc, What would be included in a specialty drawing, Location and type of stainless steel equipment, location and type of Plumbing connections, electrical layout to the equipment, relevant controls and systems, Written orders from the architect or owner to the contractor, made because of additions deletions revisions to the original drawing and give the contractor permission to change the work, Also called specs, are the written description and instructions by the architect of the work to be done, Shows elevations with contour lines and indicates the north-south and East-West orientation of the property, What guidelines must be used when dealing with multiple agencies, The original drawing remains with the architect, Copies of the original drawings for all trades, Also known as shop drawings or approved drawings, detailed drawings prepared by the manufacturer of the equipment to be used, What is the importance of blueprint reading, 1 They contain the information and Direction the Tradesman must have to do his part of the total job as planned by the architect 2 there's no other source of information other than specification 3 the architect cannot be available at all times to answer questions which of the tradesman's responsibility 4 blueprints harmonized a job for all trades in our labor-saving device because each trade knows the exact location of his work and that of other trades involved 5 no one person can remember all the detailed information contained in the blueprints, What can be included in the common schedules, Where is the scale usually shown or indicated, In the title block at the lower right corner of the drawing. penetration.Select one: A listed electrical box for use in fire-resistive assemblies is being installed in a two-hour rated wall. Its a means to an end. Ben thinks they should catch the early bus, so they decide to meet at the bus station in the morning. I feel like there's not a lot of practice exams or practice activities so that when you do the quiz you don't completely tank it. Name the two basic types of pressure connectors. I feel like an instructor can make or break the experience. Describe the overall project in terms of number of buildings and general construction. is also shown as in an enlarged mechanical room detail. On the second level of the training center, Type X1 lighting fixtures are mounted ? or silver-plated. ET2.1 (3 of 4). Blueprints Level 1: Lesson 2 Understanding Architectural Views And How To Draw Them Blueprints Level 1: Lesson 3 Recognizing And Understanding Common Scales . for feeders and branch circuits together.Select one: To avoid unduly stressing the conductors during installation, ensure that ? Calculate the line lighting feeder demand for a 16,000-square-foot dwelling unit, including small-appliance and laundry loads. Use the index below to search for Blueprints . Using an ampere load of 165 amperes, determine the minimum-size 120/240-volt, single-phase, 3-wire service. 21. There is one lesson for each of the 10 units in the curriculum. Description. Ti 3rd year - Rigging, Hoisting and Signaling, Level 1; Lesson 1-4 m eCl 19 1st year - Job Information 1, Level 1; Lessons 4-6 as s Division 2Site Work b. Twist-on-typeSelect one: What NEC Article should be followed to determine the maximum allowable number of wires or cables permitted in cable trays?Select one: A coating of joint compound on the surface of a conductor, prevents a(n) ? Develop the curriculum vision along with key outcomes and assessment 3.
Blueprint Visual Scripting | Unreal Engine 4.27 Documentation Eo4.1 (2 of 4) what room(s) on.
Paul Edwards - Brigham Young University - LinkedIn In A Long Way from Home (193719371937), McKays autobiography, he claims that the poems title does not refer to the official presidential residence. What is the feeder (neutral) demand load in volt-amperes for this electric dryer? Right-click an Actor in the Level, then in the context menu under Level Blueprint, select the Event you wish to add. A good instructor will take the time to do the homework themselves to familiarize the topics and also develop interesting delivery methods for the material. Who should read and thoroughly understand specifications? 3. Teach-nology Printable Worksheets & Make Your Own, Using Apps, ESL Blogs and other Technology in the ESL classroom-2014, Updated Information For Refugee Students on Central Blog, Check out the new Digital Literacy Guide Link. , both in a vertical and a horizontal direction. the conductor and apply a(n) ? Review preflight planning, do a preflight walk-around for the aircraft, check with . Use all four E02.1 drawings to answer the question. to send you a reset link. $ 48.99 $ 44.99. AC Theory, Level III - 3rd Ed. TEACHING. The feeder demand (line) load for a 5.5 kW, 120/240-volt electric dryer in a dwelling unit is 5,500 volt-amperes. All of these materials and components are needed. If you are just getting started with Blueprints, this provides a high-level overview of what they are and what they can do. Calculate the velocity components of a projectile at the maximum height 1 1 2 . What is the expansion capacity of the fire alarm system? What section of the specifications provides wages and payroll information for the project? Introducing Cram Folders! Every introductory and reinforcing lesson, plus comprehension questions to go along with each leveled reader in Level 2 and 3. and spelling word lists for each skill Levels 1, 2, and 3. Does this disclaimer influence your reading of the poem? 1.) Half of what you learn in the classroom you will never use in the field, unless you plan to be an electrical engineer or estimate. You have created 2 folders. Grade 2 Unit 16. Web blueprints level 2 lesson 6. Object line. Division 0 (Sections 00020 through 00830) of the Commercial Specifications, titled ?
Lesson 4: ICP 1: Math for Blueprint Reading : Flashcards track lights controlled by three wall mounted switches. elevationc. When we did conduit fabrication it would have been great actually doing the bends with a 555 or Chicago bender in the shop to see the math and techniques in action. Use a chart to evaluate different elements from the homepages of their websites. 2. Blueprints, Lvl II Lesson 4. f ( x ) = 3 x ^ { 4 } - 15 x ^ { 3 } f (x)= 3x4 15x3. The ? Not_Ltc. . The number of arrowheads is the same as the number of circuits. Create the course structure (short and long-term courses) 4. Designed for teachers, coaches, and players these lesson plans will provide a structured enjoyable experience to increase skill levels progressively reinforcing . You are terminating a 750 kcmil aluminum conductor to a copper or bronze pad. Use this PowerPoint, created to assist in your Fundations lessons, to have a BLAST while teaching and learning phonics skills!
Free Engineering Flashcards about Blueprint Schedules - StudyStack Level 2 2.5.4 - Word Order Educator Resources for 2.5.4 - Word Order Planning a Trip Ben and Moby are going on a vacation. Grade 2 Unit 14. Open the Level Blueprint. 11. .Select one: The ? Add to folder What specific lighting control method is used for the Type W2 exterior light fixtures located outside and attached to the first floor of the office building? Creating lesson plans with the help of PPTs for the reading, writing, speaking, and listening sections. The customer has decided to use the minimum size service. from reforming after the installation process.Select one: Only pressure-type connectors marked ? I.
PDF 2019 ASSIGNMENTS AUG Sun Mon Tue Wed Thu Fri Sat MON 175-W metal halide 277-V - E1.3: 16. 4 yr. ago. AC Theory, Level II - 3rd Ed. In the Calvin cycle, where does the carbon come from to form glucose? L. 617. Lots of ways to prepare for top-notch learning. Basically bullshit you have to put up with to get turned out. Grade 4 Grade 3. Total feeder demand for these four appliances after appliance demand factor is applied. What is the minimum number of 120-volt, 20-ampere lighting branch circuits needed for a 1,800-square-foot dwelling unit? Christina_Zhao11. Where colors for wire are established, what color will 208/120-volt, 3-phase, 4-wire be? For each cadet (4 to 5 cadets per day, up to 4 hours per cadet), review lesson plan and brief the mission. .
Unit 2, Lesson 4 questions & answers for quizzes and tests - Quizizz A solid object may be drawn as a flat plane object showing all sides, or it may be drawn as an isometric drawing.
Layout [deleted] 4 yr. ago.
Orientation Level 1: Lesson 4 The IBEW and its History Flashcards by Outside lightingc. Cooling Tower. All of the above. Lesson 4 - This lesson asks students to revisit the well-known story of a figure in the civil rights movement-Rosa Parks-through the primary source documents associated with her arrest in 1955. 21 terms. Teacher is very skilled at trig + theory. We have 3-4 blended learning lessons due before class day. Writing lesson plans isn't usually a teacher's favorite part of the job, but it's a necessary one. How many O3 type (Emergency/Normal) fixtures are required on the first level of the office building? The IBEW building is located at ? 1/0 AWG copper service requires a 6 AWG copper grounding electrode conductor. Match the following lines to their correct term. What is the room number of this boiler room? I was lucky enough to have a very awesome JW when I first started that taught me the basics very well, since then basically on my own. Blueprints, Lvl II Lesson 4. Introducing Cram Folders!
PDF Test Blueprinting II: Creating a Test Blueprint - National Board Of 24 Lesson Plan Examples for Every Level and Subject. .Select one: The temperature requirement that a four-hour fire-resistive assembly must withstand during the ASTM E 814/UL 1479 is ? 8 Q Division?of commercial or industrial specifications is the primary focus of the Electrical Worker. Finally, the user evaluates There are some bad instructors out there. These course outlines and/or long-range lesson plans will serve to implement department, school, and District level philosophy, goals, objectives, policies, and administrative regulations. wall switch and an occupancy sensor Blueprints of the villa were straight forward with individual sub-sections, each with a.
24 Lesson Plan Examples for Every Level and Subject - We Are Teachers lamp and ballast. .Select one: When testing a through penetration system, UL tests various different manufacturers products in the assembly. This is the fourth lesson of "Let's Learn English" - a 52-week course for English learners. Well the schools have us by the balls, I wouldn't want to stir shit up you know? a. estimateb. What is the width of the cased opening leading to the Smith Residence's kitchen of Sheet RA-1? Find out how you can intelligently organize your Flashcards. Describe the overall project in terms of number of buildings and general construction. $10.00. Press J to jump to the feed. Blueprints Level 1: Lesson 4 Icp 1: Math For Blueprint Reading Blueprints Level 1: Lesson 5 Using Blueprints Specifications, Elevations And Schedules Properly
lesson plans level 1 basic and practical lesson plans for perceptual motor. Pipe Cap (8) $6.00. This Test Blueprint approach builds test questions from lesson plans. Successful Pickleball. When you need a break, try one of the other activities listed below the flashcards like Matching, Snowman, or Hungry Bug. The lights in the training center maintenance office Room 131 lighting are also controlled by an occupancy sensor. When you've placed seven or more cards in the Don't know box, click "retry" to try those cards again. Only UL-approved wire pulling compounds He just recites the Blended Learning slides for 4 hours straight. 175-W metal halide 277-V - E1.3: 16. Based on a 175 . Josh_Belendez. Look at the large card and try to recall what is on the other side. Orientation Level 1: Lesson 2 The Attributes Of An Ibew/Neca Apprenticeship, Orientation Level 1: Lesson 3 Knowing Your Apprenticeship And Your Responsibilities, Orientation Level 1: Lesson 4 The Ibew And Its History, Orientation Level 1: Lesson 5 Neca's Structure And Heritage, Orientation Level 1: Lesson 6 Your Job And The Future It Holds For You, Orientation Level 1: Lesson 7 Sexual Harassment, Orientation Level 1: Lesson 8 The Economics Of Employment, Orientation Level 1: Lesson 9 Safety Never Takes A Break, Job Information Level 1: Lesson 1 Identifying Some Basic Tools Of The Trade, Job Information Level 1: Lesson 2 The Workplace Of An Electrical Worker, Job Information Level 1: Lesson 3 The Proper Care And Use Of Ladders, Job Information Level 1: Lesson 4 Choosing And Installing The Correct Masonry Fastener, Job Information Level 1: Lesson 5 Alignment And Measurement, Job Information Level 1: Lesson 6 The Reality Of Electrical Shock, Job Information Level 1: Lesson 7 Electrical Safety, Job Information Level 1: Lesson 8 Understanding The Function And Design Of Ground Fault Interrupters, Job Information Level 1: Lesson 9 Caution Overhead Work In Progress, Job Information Level 1: Lesson 10 Using And Installing Twist On Wire Connectors, Job Information Level 2: Lesson 1 Building Wire Construction And Insulation Properties, Job Information Level 2: Lesson 2 How Building Wire Is Sized, Job Information Level 2: Lesson 3 Working Properly With Aluminum Conductors, Job Information Level 2: Lesson 4 Identifying Commonly Used Electrical Materials, Job Information Level 2: Lesson 5 Working With Prefixes And Powers Of 10, Job Information Level 2: Lesson 6 Using The Metric System And Metrication Changes, Job Information Level 2: Lesson 7 How To Solve Basic Algebraic Equations, Job Information Level 2: Lesson 8 Introduction To Firestopping, Job Information Level 2: Lesson 9 Fire Resistant Wall And Floor Assembly Penetrations, Job Information Level 2: Lesson 10 Firestop Applications, Job Information Level 2: Lesson 11 Wire Pulling Techniques, Code, Standards, And Practices 1, Based On The 2020 Nec Online Materials: Lesson 1 An Introduction To The National Electrical Code, Code, Standards, And Practices 1, Based On The 2020 Nec Online Materials: Lesson 2 Interpreting The Language Of The NecArticle 100, Code, Standards, And Practices 1, Based On The 2020 Nec Online Materials: Lesson 3 Understanding And Applying Article 110 Of The Nec, Code, Standards, And Practices 1, Based On The 2020 Nec Online Materials: Lesson 4 Understanding And Applying Article 110 Of The Nec Ii, Code, Standards, And Practices 1, Based On The 2020 Nec Online Materials: Lesson 5 General Building Wire Properties And The Nec, Code, Standards, And Practices 1, Based On The 2020 Nec Online Materials: Lesson 6 Understanding Conductor Insulation And Nec Specifications, Code, Standards, And Practices 1, Based On The 2020 Nec Online Materials: Lesson 7 Introduction To Wiring Devices, Code, Standards, And Practices 1, Based On The 2020 Nec Online Materials: Lesson 8 General Requirements Related To Installing Wiring Devices, Code, Standards, And Practices 1, Based On The 2020 Nec Online Materials: Lesson 9 General Requirements Related To Installing Industrial Wiring Devices, Code, Standards, And Practices 1, Based On The 2020 Nec Online Materials: Lesson 10 Specific Receptacle Installation Requirements, Code, Standards, And Practices 1, Based On The 2020 Nec Online Materials: Lesson 11 Specific Switch Installation Requirements, Blueprints Level 1: Lesson 1 The Fundamentals Of Blueprint Drawing And How To Make Proper Sketches, Blueprints Level 1: Lesson 2 Understanding Architectural Views And How To Draw Them, Blueprints Level 1: Lesson 3 Recognizing And Understanding Common Scales Used On Blueprints, Blueprints Level 1: Lesson 4 Icp 1: Math For Blueprint Reading, Blueprints Level 1: Lesson 5 Using Blueprints Specifications, Elevations And Schedules Properly, Blueprints Level 1: Lesson 6 Understanding And Drawing Electrical Symbols Used On Blueprints, Blueprints Level 1: Lesson 7 Understanding And Drawing Mechanical Symbols Used On Blueprints, Blueprints Level 1: Lesson 8 Understanding How To Properly Use A Residential Blueprint, Blueprints Level 1: Lesson 9 Reading And Analyzing A Residential Blueprint, Dc Theory Level 2: Lesson 1 The Series Circuit, Dc Theory Level 2: Lesson 2 Understanding And Calculating Resistance In Dc Series Circuits, Dc Theory Level 2: Lesson 3 How Current Reacts In Dc Series Circuits, Dc Theory Level 2: Lesson 4 How Voltage Functions In Dc Series Circuits, Dc Theory Level 2: Lesson 5 How To Calculate Power In Dc Series Circuitss, Dc Theory Level 2: Lesson 6 Energized Circuits And The Potential Hazards They Possess, Dc Theory Level 2: Lesson 7 How To Draw Basic Electrical Circuits Correctly, Dc Theory Level 2: Lesson 8 Introduction To Test Instruments, Dc Theory Level 3: Lesson 1 How Current Reacts In Dc Parallel Circuits, Dc Theory Level 3: Lesson 2 Understanding Resistance In Dc Parallel Circuits, Dc Theory Level 3: Lesson 3 Working With Ratios And Proportion, Dc Theory Level 3: Lesson 4 How Voltage Functions In Dc Parallel Circuits, Dc Theory Level 3: Lesson 5 How To Calculate Power In Dc Parallel Circuits, Dc Theory Level 4: Lesson 1 Understanding Resistance In Dc Combination Circuits, Dc Theory Level 4: Lesson 2 How Current Reacts In Dc Combination Circuits, Dc Theory Level 4: Lesson 3 How Voltage Functions In Dc Combination Circuits, Dc Theory Level 4: Lesson 4 How To Calculate Power In Dc Combination Circuits, Dc Theory Level 4: Lesson 5 How Voltage And Current Dividers Work, Dc Theory Level 4: Lesson 6 The Design And Operation Of The 3 Wire, Single Phase System.